| MOQ: | 1 |
| Price: | 299 |
Product Details
|
Product Name
|
Common Rail Diesel Fuel Injection Pump
|
|
Place of Origin
|
Wuhan,China
|
|
Warranty
|
12 Months
|
|
Delivery time
|
3-5 Days, subject to the order quantity
|
|
Quality
|
100% Tested
|
|
Packing
|
Customer Requirement
|
|
Service
|
After-Sales Service
|
|
Size
|
Standard Size
|
|
Payment
|
TT,Trade Assurance,PayPal,Credit Card
|
|
Advantage
|
Perfect Fit
|
![]()
![]()
![]()
Hino Medium-Duty Trucks: Hino 500 Series, Hino Ranger, Hino Dutro (equipped with J05E engines).
Kobelco Excavators: SK200-8, SK210-8, SK250-8, SK260-8.
Hino Industrial Equipment: Various industrial, agricultural, and construction platforms matching the J05E block.
Engine Model: Hino J05E / J05E-TA (5.2L 4-Cylinder Diesel Engine)
Pump Type: Denso HP3 Series Common Rail Pump
![]()
Company Info
![]()
Wuhan Jinhong Auto Parts Co., Ltd. is a manufacturer and exporter of common rail fuel injectors integrating manufacturing,processing and R & D.
Our factory has a complete and scientific management system and professional product development team, products have been advancing with The Times, quality is also constantly improving, product quality and service have been widely recognized by the industry. Our company has its own factory, combined with the sales model of trade factory, we can provide customers with a full range of services. In addition, our company has international logistics partners to reduce transportation costs for customers. Our company is a leading manufacturer and supplier of Marine parts and auto parts in China. At the same time, we have established partnerships with hundreds of factories specializing in the production of various high-quality auto parts.
Our goal is to provide the best service at the best price, your satisfaction is our best return. Look forward to working with you. Welcome friends from all walks of life to visit, guidance and business negotiations.
![]()
![]()
Set Timing (TDC): Rotate the engine to Top Dead Center (TDC) on Cylinder 1. Lock the engine timing gear train.
Prep the Pump: Lubricate the new mounting flange O-ring with clean engine oil.
Align & Insert: Align the timing marks on the pump drive gear with the engine idler gear. Slide the pump smoothly into the housing.
Torque Fasteners: Tighten the mounting bolts evenly in a crisscross pattern. Torque the drive gear nut to factory specs.
Connect Lines & Wiring: Reconnect all high/low-pressure fuel lines and plug in the Suction Control Valve (SCV) wiring harness.
Prime the System: Use the manual hand primer on the fuel filter base until it becomes stiff. Do not crank the engine dry.
FAQ